UNDERSTANDING THE 2026 NUPRC LICENSING ROUND: KEY CHANGES, REQUIREMENTS AND CONSIDERATIONS FOR PROSPECTIVE PARTICIPANTS

Table of Contents

1.       INTRODUCTION

The bidding portal for the 2026 Licensing Round was opened by the Nigerian Upstream Petroleum Regulatory Commission (the “NUPRC”) on Friday, November 20, 2026, alongside the publication of the Nigeria 2026 Licensing Round Guidelines (the “2026 Guidelines”).

 

The 2026 Licensing Round offers 40 petroleum blocks across Nigeria’s onshore, shallow water and deep offshore terrains for competitive bidding by eligible companies, and is governed by the Petroleum Industry Act, 2021 (the “PIA”), the Petroleum Licensing Round Regulations, 2022 (the “Principal Regulations”), as amended by the Petroleum Licensing Round (Amendment) Regulations, 2026 (the “Amendment Regulations”). While the 2026 Guidelines retain several features of the 2025 Licensing Round, they introduce notable changes to the eligibility requirements, consortium arrangements, financial and technical prequalification criteria, bid evaluation methodology and work programme security requirements.

 

This Briefing Note provides an overview of the 2026 Licensing Round, examines its applicable legal and regulatory framework, discusses the key participation requirements and highlights the material changes from the 2025 Licensing Round, together with their legal, technical and commercial implications for prospective participants.

 

2.       LICENSING ROUND TIMETABLE

The 2026 Guidelines set out the following timetable for the Licensing Round:

 

  Activity

Date

Formal announcement of the Licensing Round

October 6, 2026

Advertisement of the Licensing Round

October 20 to 24, 2026

Launch of the Licensing Round Portal and opening of registration

November 20, 2026

Pre-Bid Conference

December 16, 2026

Closing of registration

January 15, 2027

Evaluation of registration documents

January 18 to February 1, 2027

Notification of prequalified applicants

February 1, 2027

Data access, evaluation and bid submission

February 2 to April 15, 2027

Technical Bid Evaluation

April 16 to 30, 2027

Notification of qualified companies

May 1, 2027

Commercial Bid Conference

May 7, 2027

Notification of winning and Reserve Bidders

May 7, 2027

 

3.       STRUCTURE OF THE LICENSING ROUND

The 2026 Licensing Round adopts a two-stage process comprising a qualification stage and a bid stage. At the qualification stage, applicants, whether participating individually or as members of a consortium, are assessed against the applicable legal, technical, financial and health, safety and environment requirements. Only applicants that are successfully prequalified and shortlisted by the NUPRC may proceed to the bid stage, where they are invited to submit Technical and Commercial Bids for evaluation by the NUPRC.

 

The 2026 Guidelines also distinguish between the contractual arrangements applicable to the blocks on offer. Blocks in Category A (Deep Offshore) are offered under a Production Sharing Contract (“PSC”), while Categories B (Shallow Water) and C (Onshore) blocks are offered under the applicable exploration and production licence contract arrangements. The applicable contractual terms are set out in the relevant Model Contracts and the PSC term sheet in Schedule G of the 2026 Guidelines.[1]

 

4.       QUALIFICATION OF PROSPECTIVE PARTICIPANTS

4.1    Eligibility Requirements

Under paragraph 6.1 of the 2025 Guidelines, only companies incorporated on or before February 27, 2026, were eligible to participate in the Licensing Round. This effectively imposed an incorporation cut-off date on prospective applicants.

The 2026 Guidelines remove this express incorporation cut-off date. Under paragraph 6.1, an applicant may be a company incorporated in Nigeria or a foreign company. However, in accordance with section 70(2) of the PIA, a Petroleum Prospecting Licence (“PPL”) may only be granted to a company incorporated and validly existing in Nigeria under the Companies and Allied Matters Act, 2020 (“CAMA”). Accordingly, a successful foreign bidder must incorporate a Nigerian subsidiary before the grant of the PPL.

This change provides greater flexibility for newly incorporated companies and foreign investors seeking to participate in the 2026 Licensing Round.

4.2    Consortium Qualification Requirements

One of the more significant changes concerns the qualification requirements applicable to consortium arrangements. Under paragraph 12.1(d) of the 2025 Guidelines, each consortium member was required to satisfy the legal and financial requirements, while the designated Operator was required to satisfy the applicable qualification criteria, including the legal, financial, technical, health, safety and environmental performance requirements.

The Amendment Regulations revise this position. Under the amended regulation 10(2), each consortium member must satisfy the legal requirements, while the financial requirement may be met by any consortium member that independently satisfies it, and at least one member designated as the Operator must satisfy each of the applicable qualification criteria. Paragraphs 12.1(d) and 12.3(h) of the 2026 Guidelines also address these requirements. In particular, paragraph 12.3(h) provides that the financial requirement may be met by any member of the consortium that independently satisfies the requirement.[2]

These changes are particularly relevant to companies seeking to participate through consortium arrangements where members have complementary financial and technical capabilities. Prospective participants should also ensure that their consortium agreements clearly address participating interests, operatorship, financial contributions, technical responsibilities, decision-making arrangements and liability for the performance of the work programme.

4.3    Technical Qualification Requirements

The technical qualification requirements have also been revised. Under paragraph 12.3(a) of the 2025 Guidelines, an applicant or the member designated as Operator was required to demonstrate a minimum of three years’ experience in geological and geophysical capabilities, drilling and well engineering, production engineering and technology, and reservoir evaluation and management in deep offshore, onshore and shallow water operations.

The 2026 Guidelines adopt a category-based approach. For Category A (Deep Offshore) blocks, applicants must demonstrate at least two years’ experience in upstream petroleum operations in Nigeria or a comparable terrain elsewhere, either as an operator or a partner in the operations. Alternatively, applicants may provide evidence of a partnership or technical arrangement with a company possessing the requisite two years’ experience, or a technical arrangement with an upstream petroleum operations service company with at least five years’ experience in providing exploration, development and production support in deep offshore upstream petroleum operations in Nigeria or a similar terrain.

For Categories B (Shallow Water) and C (Onshore), applicants must demonstrate experience in upstream petroleum operations as an operator or partner in deep offshore, shallow water, onshore or frontier areas, whether in Nigeria or comparable terrains elsewhere. Alternatively, applicants may provide evidence of a partnership or technical arrangement with a company possessing the requisite upstream petroleum operational experience, or a technical arrangement with an upstream petroleum operations service company having experience in deep offshore, shallow water or onshore operations, or frontier area petroleum operations, in Nigeria or a comparable terrain.

For Category D (Frontier Acreages), applicants must demonstrate experience in upstream petroleum operations as an operator or partner in deep offshore, shallow water, onshore or frontier areas, whether in Nigeria or comparable terrains elsewhere. Alternatively, applicants may provide evidence of a partnership or technical arrangement with a company possessing the requisite experience, or a technical arrangement with an upstream petroleum operations service company having experience in any of those terrains in Nigeria or a comparable terrain.

The 2026 Guidelines further permit applicants to rely on their parent companies to satisfy the technical requirements, provided that the parent company gives the NUPRC  a written undertaking to make available the personnel, resources and technical support required to perform the work programme commitment during the initial exploration period. For Categories B to D, where an applicant is a newly incorporated company or does not possess the requisite technical experience, it may rely on the experience of its management team, provided that the management team has at least five years’ experience in petroleum exploration and production operations. This alternative is not available to applicants for Category A blocks.

4.4    Financial Qualification Requirements

The financial qualification requirements have undergone a substantial revision. Under paragraph 12.2 of the 2025 Guidelines, applicants were required to demonstrate verifiable funding capacity through any of the following:

i.       Minimum average annual turnover of US$100 million for deep offshore blocks and US$40 million for onshore and shallow water blocks; or

ii.     Minimum cash in bank of US$100 million for deep offshore blocks and US$40 million for onshore and shallow water blocks; or

iii.    A bank guarantee of US$100 million for deep offshore blocks and US$40 million for onshore and shallow water blocks; or

iv.    For newly incorporated companies, a parent company guarantee of the corresponding amount.

The 2026 Guidelines replace the previous financial qualification requirements with funding capacity thresholds differentiated by block category. Under paragraph 12.3(e), applicants must demonstrate funding capacity, by cash or committed funding, of not less than:[3]

Block category

Minimum funding capacity

Category A (Deep Offshore)

US$200 million

Category B (Shallow Water)

US$85 million

Category C (Onshore)

US$70 million

Category D (Frontier Acreages)

US$20 million

 

In addition to demonstrating the prescribed funding capacity for the relevant block category, each applicant must demonstrate its financial viability by satisfying either of the following requirements:

a.     Financial Ratio Test: The Applicant must demonstrate, based on its most recent audited financial statements, a current ratio of at least 2:1, a gearing ratio of not more than 70% and an interest cover of at least 2.0. The interest cover requirement does not apply where the Applicant has no interest-bearing borrowings; or

 

b.     Shareholders’ Funds Test: The Applicant must have shareholders’ funds of not less than US$200 million for Category A, US$75 million for Category B, US$50 million for Category C or US$20 million for Category D.

Furthermore, where an Applicant relies on bank confirmation letters, facility agreements or binding equity commitment letters to demonstrate its funding capacity, it must demonstrate available funds of not less than 100% of the combined amount of: (i) the estimated cost of the minimum Work Programme for the initial exploration period for the relevant Category; and (ii) the minimum Signature Bonus for that Category, being US$3,000,000 per Block, as prescribed under paragraph 16.2 of the 2026 Guidelines.

4.5    Bid Submission and Evaluation

Both the 2025 and 2026 Licensing Rounds adopt a two-stage process comprising prequalification and the subsequent bidding stage. The restriction limiting an applicant to bids for not more than two blocks is also retained in the 2026 Guidelines. Similarly, the electronic submission requirements under paragraph 17.2 of the 2026 Guidelines, including the submission of bid proposals in three separate parts (Technical Bid, Commercial Bid and Bid Guarantee), the requirement for the Technical Bid to be uploaded unencrypted and the Commercial Bid and Bid Guarantee to be encrypted, were already provided for under the 2025 Guidelines. These requirements have therefore been retained in the 2026 Guidelines.

The Commercial Bid parameters have been revised. Under the 2025 Guidelines, the bid evaluation process already adopted a weighted points system based on a combination of technical and commercial bid parameters, including the proposed Work Programme Financial Commitments, Work Performance Security and Signature Bonus.[4] The 2026 Guidelines specify the Commercial Bid parameters to include the Signature Bonus, additional Work Programme Commitment above the prescribed minimum and, for Category A blocks, additional Profit Oil and Profit Gas splits offered to Government above the applicable splits in the PSC term sheet.[5] The weighted scoring approach has been retained, with the winning bid determined by the highest weighted aggregate score derived from the combined results of the Technical Bid Evaluation and Commercial Bid Evaluation.

4.6    Bid Guarantee

The Bid Guarantee requirement has been retained, but its validity period has been extended.

Under paragraph 17.7 of the 2025 Guidelines, bidders were required to submit a Bid Guarantee equivalent to 5% of the proposed Signature Bonus, valid for 120 calendar days after the Commercial Bid Conference. Paragraph 17.9 of the 2026 Guidelines retains the 5% requirement but extends the validity period to 180 calendar days after the Commercial Bid Conference, subject to any mutually agreed extension. Under paragraph 17.9(b), the guarantee must be an on-demand payment bond issued by an international bank with a minimum “BBB” rating from S&P Global, Fitch Ratings, or Moody’s or a Nigerian bank with a minimum “BBB” rating from GCR, Augusto & Co, AM Best, or Data Pro.

The extension increases the period for which bidders must maintain the relevant financial security and should be considered when arranging banking facilities and preparing the Commercial Bid.

4.7    Reserve Bidders

The designation of Reserve Bidders has been revised under the 2026 Guidelines to reflect the amendments introduced by the Amendment Regulations. While the 2025 Guidelines provided for the designation of only the next highest-scoring bidder as the Reserve Bidder, the Amendment Regulations amend regulation 12(14)(c)(ii) of the Principal Regulations to provide for the announcement of the next four bids with the highest values as Reserve Bidders, who may be considered in order of priority where the highest bidder fails to satisfy the conditions for an award.

In line with this amendment, paragraph 19.3(a) of the 2026 Guidelines provides for the announcement of the next four highest-ranked bidders as Reserve Bidders, in descending order of priority. However, while the Amendment Regulations refer to bids with the highest values, the 2026 Guidelines determine the ranking by reference to the highest aggregate scores calculated under the published scoring methodology. This difference in wording may require clarification by the NUPRC as to whether the ranking of Reserve Bidders is to be based on bid value or aggregate evaluation score.

4.8     Work Programme Commitment Guarantee

The financial security requirements for work programme commitments have been revised. Under paragraph 22.2 of the 2025 Guidelines, the work commitment was required to be supported by a bank guarantee, letter of credit or performance bond in an amount determined by the NUPRC.

Regulation 21(5) of the Principal Regulations, as amended by the Amendment Regulations, requires the work commitment guarantee to cover 100% of the value of the work programme commitment and any additional work programme commitment. This requirement is reflected in paragraph 22.3(a) of the 2026 Guidelines, which requires the Work Programme Performance Security to be provided for the amount prescribed under regulation 21(5). Where the guarantee constitutes a bid parameter under section 74(2)(v) of the PIA,[6] its value is to be determined by the NUPRC.

Paragraph 22.3 of the 2026 Guidelines provides that the Work Programme Performance Security must be in the form of a bank guarantee, standby letter of credit or performance bond issued by an international bank with a minimum “BBB” rating from S&P Global, Fitch Ratings or Moody’s, or a Nigerian bank with a minimum “BBB” rating from GCR, Augusto & Co, AM Best or Data Pro. Guarantees or bonds issued by insurance companies are not accepted, and the security must be in the form prescribed in Schedule I to the 2026 Guidelines. Applicants should therefore consider the cost and availability of the required security when determining their work programme commitments.

5.       OTHER REQUIREMENTS FOR PROSPECTIVE PARTICIPANTS

In addition to the changes discussed above, applicants should note the following:

5.1    Registration and Application Fees

Applicants must register on the Licensing Round Portal and pay a registration fee of US$10,000 and a bid application fee of US$25,000 per Block. A processing fee of US$500 per transaction also applies. All applicable fees must be paid within the prescribed timelines, failing which the Application may be rendered invalid.

 

5.2    Data Room Access and Due Diligence

Applicants must lease the available data for their preferred Blocks from the National Data Repository (NDR) or the relevant Multiclient Company and submit evidence of payment with their Bids. Where a Competent Person’s Report is available for a Block, the Bidder must purchase it for US$50,000 and submit evidence of purchase. Physical data room access is optional and attracts a fee of US$10,000 per session per Block. Applicants should conduct the necessary technical and commercial due diligence before submitting their Bids.

 

5.3    Beneficial Ownership Disclosure

Applicants must disclose all persons with significant control, including persons holding at least 5% of the shares, interests or voting rights, persons with the right to appoint or remove a majority of directors, and persons exercising significant influence or control. The Beneficial Ownership Declaration Form in Schedule E must be completed and submitted with the Application.

 

5.4    Misrepresentation and Non-Disclosure

Any misrepresentation, omission, falsification, inaccuracy or incomplete disclosure in documents submitted during the Licensing Round may invalidate the Bid and result in disqualification. The NUPRC may also verify submitted information and withdraw any provisional award or letter of award where deficiencies are subsequently discovered.

6.       CONDITIONS FOR AWARD

Being declared the winning Bidder does not automatically confer a PPL. Under paragraph 19.3 of the 2026 Guidelines, the NUPRC will issue an Offer Letter to the winning Bidder, who must satisfy the applicable conditions within 90 days of the issuance of the Offer Letter.

Within this period, the successful Bidder must submit the prescribed post-award documentation, including the parent company guarantee (where applicable), Work Programme Performance Security, evidence of payment of the applicable fee, first-year rent and Signature Bonus, a sworn affidavit and the duly executed Model Contract. Where the successful Bidder is incorporated outside Nigeria, it must also incorporate a wholly owned Nigerian subsidiary within the same 90-day period, to which the PPL will be granted.[7]

The Signature Bonus for each block must fall within the prescribed range of US$3 million to US$7 million. The amount offered must be paid in full in United States Dollars before the grant of the PPL.[8]

The minimum and additional Work Programme Commitments offered by the successful Bidder will be incorporated into the applicable Model Contract and will constitute binding obligations. Failure to meet the minimum Work Programme Commitment may be taken into account by the NUPRC when considering an application for the optional extension period, without prejudice to the enforcement of the Work Programme Performance Security or any other applicable sanction.

7.       KEY CONSIDERATIONS FOR PROSPECTIVE PARTICIPANTS

In view of the requirements under the 2026 Guidelines, prospective participants should consider the following before participating in the 2026 Licensing Round:

                 i.          Early assessment of eligibility: Applicants should review their corporate structure, technical experience, financial capacity and HSE compliance to identify any gaps that may affect prequalification.

 

               ii.          Appropriate consortium structuring: Companies intending to participate through consortium arrangements should agree on their respective participating interests, operatorship, financial contributions, technical responsibilities and governance arrangements before submitting their applications.

 

              iii.          Funding and financial security: Applicants should confirm the availability of the required funding and make early arrangements for the Bid Guarantee and Work Programme Performance Security.

 

              iv.          Technical and commercial due diligence: Prospective participants should undertake appropriate geological, geophysical, technical and commercial assessments of their preferred blocks before determining their bid parameters and work programme commitments.

 

                v.          Compliance with timelines: Applicants should monitor the Licensing Round Portal for updates, clarifications and any amendments to the Guidelines, and ensure that applications, bids and supporting payments are submitted within the prescribed timelines.

 

8.       CONCLUSION

The 2026 Licensing Round introduces important changes to bidder qualification, consortium participation, bid evaluation and work programme financial security. Prospective bidders should carefully assess these requirements and ensure that their proposed bid structures, funding arrangements and work programme commitments satisfy the PIA, the Regulations and the 2026 Guidelines.

Please note that the foregoing does not constitute legal advice and represents only the views of the authors. Any enquiries in respect of this publication should be directed to the key contacts.

REFERENCES


[1] Although the 2026 Guidelines recognise Category D (Frontier Acreages) in the categorisation of blocks, no Category D blocks are included in the list of blocks on offer for the 2026 Licensing Round.

[2] Amended regulation 10(2)(c) requires the designated Operator to satisfy each applicable qualification criterion, whereas paragraph 12.3(h) of the 2026 Guidelines permits any consortium member that independently satisfies the financial requirement to meet that requirement. The NUPRC’s clarification on the relationship between these provisions would be useful.

[3] Note: Applicants may rely on a parent company or financier to satisfy the financial qualification requirements, provided that the parent company or financier meets the applicable financial requirements by reference to its own financial statements and resources. Where a parent company is relied upon, it must undertake in writing to provide the required parent company guarantee if the applicant is the winning bidder. Where a financier is relied upon, a duly executed funding agreement must be submitted with the application.

 

[4] Paragraph 17.6(g) of the Nigeria 2025 Licensing Round Guidelines. See also paragraph 19.2(b), (c) and (e).

[5] Paragraph 17.8(a)(i)–(iii) of the 2026 Guidelines.

[6] Section 74(2)(v) of the PIA permits the NUPRC to prescribe any other bid parameter specific to a licensing round. Where the work commitment guarantee constitutes such a bid parameter, its value is to be determined by the NUPRC.

[7] Paragraphs 6.1, 6.4 and 19.3(e) of the 2026 Guidelines.

[8] Paragraphs 16.2 and 16.6 of the 2026 Guidelines.

Please do not treat the foregoing as legal advice as it only represents the public commentary views of the authors. All enquiries about this should please be directed at the key contacts

AUTHORS

Oyeyemi Oke

Partner

Chukwuemeka Ozuzu

Senior Associate

Elsie Iro

Associate

Want to keep up with our Articles?

Get our most valuable tips right inside your inbox, every month!

Related Posts

Futuristic Finance Lightbulb and Growth Arrows
FROM POWER USERS TO POWER SELLERS: APPRAISING THE NIGERIAN ELECTRICITY REGULATORY COMMISSION’S NET BILLING REGULATIONS 2026
The opportunity For decades, Nigerian businesses could only buy power from the grid. Their own solar...
Miniature Home on Documents
CHASING THE GUARANTOR: USING BANKRUPTCY PROCEEDINGS AGAINST DIRECTORS WHO SIGNED PERSONAL GUARANTEES
A personal guarantee is more than another document in a loan file. When a corporate borrower defaults,...
port shipping containers
NIGERIA’S NEW PORT REGULATOR: WHAT THE NPERA ACT RESOLVES AND WHAT IT LEAVES OPEN
Who really sets the rules for Nigeria’s port charges? With NPERA stepping into the regulatory picture,...
Web Banner Offshore
DEEP OFFSHORE FISCAL INCENTIVES: CAN NIGERIA’S NEW FISCAL FRAMEWORK UNLOCK US$50 BILLION IN PETROLEUM INVESTMENTS?
Nigeria’s new deep offshore tax remission framework could unlock up to US$50 billion in petroleum investment,...
Web Banner - ELIGIBILITY FOR NIGERIA’S CABOTAGE VESSEL FINANCING FUND_ THE DUE DILIGENCE IMPERATIVE
ELIGIBILITY FOR NIGERIA’S CABOTAGE VESSEL FINANCING FUND: THE DUE DILIGENCE IMPERATIVE
Nigeria’s reactivated Cabotage Vessel Financing Fund offers a major opportunity to expand indigenous...
AfCFTA image
THE AfCFTA REGULATORY PARADOX: ONE AFRICAN MARKET, 54 REGULATORY SYSTEMS
The AfCFTA promises greater market access across Africa, but businesses cannot assume that trade integration...
Cashflow
NIGERIA’S RECEIVABLES FINANCING BILL: WHAT IT MEANS FOR SMES
For many Nigerian businesses, growth is not held back by demand but by timing. This article explains...
Corporate Image
The New Language of Corporate Accountability: IFRS Sustainability Standards and the Nigerian Boardroom
Nigeria’s adoption roadmap for IFRS Sustainability Disclosure Standards signals a major shift for companies,...
Web Banner - business survival vs liquidation 1
COMPANY VOLUNTARY ARRANGEMENT UNDER CAMA 2020: A VIABLE OPTION FOR CORPORATE SUSTAINABILITY?
Under Nigeria's CAMA 2020, Company Voluntary Arrangements (CVAs) offer financially distressed companies...